Your feedback on a Glebe to Ultimo cycleway

A new cycling connection between Bay Street Glebe and The Goods Line

Project Status: Closed

Public consultation period to

Why we’re doing this

This cycling connection will form an important part of our bike network and make getting around safer for people walking and riding.

What we’re doing

The project includes separated cycleways along Kelly and Mary Ann streets to connect to The Goods Line and an upgrade to the existing cycleway on Wattle Street.

The project includes a new pedestrian crossing on Mary Ann Street at Jones Street.

There are 2 new trees proposed at the south-west corner of the Mary Ann and Harris streets intersection. There will be no impact to existing trees.

The project will retain 85 of the 117 existing on-street parking spaces along the route. 32 parking spaces will be removed.

Glebe to Ultimo cycleway concept designPDF · 1.96 MB · Last modified

How you can give feedback

Consultation closes at 5pm on Monday 7 November 2022.

We have a range of ways you can provide your feedback:

Other ways you can give feedback